WORK PACKAGES, ACTION PLAN AND MILESTONES
News & Events

Programme

   
 
WORK PACKAGES, ACTION PLAN AND MILESTONES
INTERREG IIIB CADSES
CADSES Book "Project in progress"
Programme

Project RainDROP

   
 
WORK PACKAGES, ACTION PLAN AND MILESTONES
Project principal data
Project content
Monitoring indicators
Work packages, Action Plan and Milestones
Consistency with INTERREG IIIB general strategies
Management of the project
Follow up actions
Project partners
Payment Claim
Contacts
Project RainDROP

Raindrop kořenová stránka

WORK PACKAGES, ACTION PLAN AND MILESTONES

Work packages

  Title of the Work Package Responsible PP
1 Overall Stormwater Management (SWM) Concept PP3
2 Integration of SWM Measures in the development areas PP2
3 Comparative analysis of SWM policies in the CADSES area PP5
4 Guideline for planning SWM measures in the CADSES area PP4
5 Project administration PP1

PP: Project Partner

Action Plan

Action No (WP.N) Description of activities, components, means Responsible PP Location (NUTS II code) Expected output / deliverables
1.1 Sewer-network database including retention and overflow structures (Inventarisation of current networks and state of the sewer-systems, Investigation of their performance, Collection of data in CADSES region-wide comparable databases) for all partner cities PP3 SK02 Five comparable sewer-network databases
1.2 Rainfall-Runoff-Model including urban and rural areas incl. negotiation of design objectives with decision makers (Exploration of models STORM and MOUSE for Rainfall-Runoff simulations, incl. pollutants load modelling, exchange with decision makers throughout the CADSES region, to define common design objectives) for all partner cities PP2 DE11 Models STORM and MOUSE compatible for rainDROP common design objectives
1.3 Modelling and assessment of actual situation (Application of the elaborated models for modelling the current situation in each pilot city, Assessment of results and Comparison of the outcome) for all partner cities PP2 DE11 Five comparable models for the pilots, Report on the comparison of these models
1.4 Analysis of potentials for decentral storm water management (Preparational work for designing the right pilots in the pilot cities, Assessment of potentials and Assignment of compatible pilot measures to pilot cities) for all partner cities PP5 CZ07 Division of pilot measures between Partners
1.5 Scenario development (Development of different combinations of measures in order to improve SWM and flood protection CADSES region-wide. Comparison of scenarios developed by different partners and Definition of a list of distinct scenarios, valid in the CADSES area) for all partner cities PP3 SK02 List of distinct scenarios, valid in the CADSES area
1.6 Modelling of impact for different scenarios (Application of the models STORM and MOUSE for the defined scenarios, Comparison of results with current situation, modelled under Action 1.2) for all partner cities PP2 DE11 Five comparable models for the scenarios, Report on the comparison of these models
1.7 Flood plain determination (Investigation and determination of potential flood plains as possible solution for areas frequently dealing with flooding) for all partner cities PP2 DE11 Report on determined flood plains
1.8 Evaluation and assessment of scenarios (Comparison of results for scenarios, modelled under Action 1.6 with current situation, modelled under Action 1.2, Evaluation of efficaciousness of combinations of measures and measures separately) for all partner cities PP3 SK02 Report on defined scenarios and their strengths and weaknesses
1.9 Report (including description of procedure, models results for actual situation and scenarios, maps, suggestions for improvements) for all partner cities PP1 CZ08 Report on Overall Storm Water Management in the CADSES region
2.1 Construction of on-site SWM measures in CZ and SK including design (Design and construction of infiltration measures for storm water from roads and pavements, introduction of green areas and local retention of storm water from roofs, alternative terrain finishing to directly infiltrate storm water, Comparison of results in pilot cities). PP3 SK02 SWM contructions in CZ and SK
2.2 Design of SWM measures in Aharnai (Design of retention and infiltration measures for the Municipality of Aharnai, using state-of-the-art knowledge and scenarios on SWM, acquired in WP1) PP4 GR30 Designs of SWM measures to be constructed in Aharnai
2.3 On-site SWM measures. Pilot construction of porous pavement in Aharnai (Construction of 3 types of pavements, enhancing temp. retention and infiltration, Equipment of measures with the appropriate instrumentation to monitor their performance. The estimated total surface (traffic roads, pedestrian space and parking areas) to cover is 400m2). PP4 GR30 Porous pavement on an area of 400 m2
2.4 On-site SWM measures. Pilot construction of trough-trench in Aharnai (Construction of 4 variants of trough-trench systems in a pilot form, enhancing temporary retention and infiltration, Installation of instrumentation measuring hydrologic and hydraulic parameters. The estimated total length of pilot trough-trenches to construct is 400m). PP4 GR30 Through-trench system at a total length of 400 m
2.5 Construction of a pilot concrete detention tank in Aharnai, excavation and concrete works (Construction of a pilot underground concrete detention tank of 1500 m3 nearby the Eschatia river, for flood and pollution control downstream of the river. Comparison construction methods (partially as open excavation and partially as a top down system)). PP4 GR30 Concrete detention tank with a volume of 1500 m3
2.6 Construction of a pilot concrete detention tank in Aharnai, inflow-, outflow- and overflow-structure (Construction of inflow structure managing exceeding discharges. Equipment with a system to wash out bottom sediments. Protection of receiving water bodies, by discharging directly to WWTP, Installation of pumps and measuring instruments). PP4 GR30 Sophisticated in- and outflow system for concrete detention tank
2.7 Construction of on-site SWM measures in Kupferzell (Trough-trench-system, cisterns, open ditches, innodrain-elements). Necessary for the drainage of new houses and roads in the development area Döttinger Str. PP2 DE11 SWM measures throughout development area Döttinger Str. in Kupferzell
2.8 Construction of a semi-central trough-trench-system in Kupferzell (combined infiltration and retention measure called trough-trench-system for the paved areas in the development area Döttinger Str. which cannot be connected to the on-site measures , Intensive monitoring of this pilot system) PP2 DE11 Pilot large scale trough-trench system in Döttinger Str.
2.9 Construction of a nature-like constructed wetland in Kupferzell (Used to retain the runoff from the areas which cannot be connected to on-site or semi-central measures. Action covers the excavation, earth movement and planting of slopes. PP2 DE11
2.10 Construction of a nature-like constructed wetland in Kupferzell (2). Action covers the construction of the inflow structure, the outflow structure with throttle and the overflow weir for exceptional intensive rainfall events. PP2 DE11
2.11 Construction of a flood retention basin for the Lietenbach catchment (Determination of current situation, extension of Action 1.7, Inspection of existing dams to be rehabilitated, construction of a flood retention basin based on a location determined by modelling and consulting of local architects). PP2 DE11 Flood retention basin in the Lietenbach catchment
2.12 Construction of a drainage system for throttled runoff in Kupferzell (Construction of a pipe system with remarkable smaller dimensions compared to a conventional storm sewer, necessary to drain the throttled discharges from the on-site and semi-central measures to the constructed wetland. PP2 DE11
2.13 Monitoring including Rainfall-Runoff-Measurements (Monitoring of all measures and scenarios in pilot cities, including measurements to determine retention and infiltration of storm water in the pilot areas, Monitoring of acceptance for SWM practices within the neighbourhood). PP2 DE11 Monitoring and Rainfall-Runoff measurements and results
2.14 Brochures for city- house-owners and investors (Publication of brochures to inform and involve the public in the pilot projects, especially since the measures will be visible in the areas and in some cases require public participation in the implementation and maintenance). PP2 DE11 Brochures for stake-holders
3.1 Review of current SWM policies in states of the CADSES area (Inventory of current SWM policies and regulations in the Partner countries, regions, as well as in remaining CADSES countries, Determination of similarities and differences between those policies and Definition of possible CADSES standards). PP5 CZ07 Definition of possible CADSES standards in SWM policy making
3.2 Assessment of the current experience of the application of SWM measures (Inventory of currently used SWM measures in the Partner countries, regions, as well as in remaining CADSES countries, Determination of similarities and differences between those measures and their application and Definition of possible CADSES standards). PP5 CZ07 Definition of possible CADSES standards in SWM
4.1 Codification of methodology for Master Planning (Codification of a Methodology applicable throughout the CADSES region for creation of a SWM Master plan, with emphasis on long-term perspectives and cooperation with other actors in spatial planning). PP4 GR30 Defined methodology for creation of a SWM Master plan
4.2 Guidelines for the choice of SWM strategies in the CADSES area (Translation of acquired knowledge in Actions 3.1 and 3.2 into a common ´language´ for application throughout the CADSES region). PP4 GR30 Manual with defined guidelines for SWM
5.1 Project administration (Administration of the different pilot projects by regional responsibles. Stimula tion of involvement of regional actors, within spatial planning, throughout the rainDROP project. Communication on a regular basis with the other regional project administrators involved in rainDROP). PP1 CZ08 n/a
5.2 Public relation including web-based platform and brochures (Dissemination and publication of objectives, plans, work in progress and results. Introduction of both the Master plan, guidelines towards decision makers and stake-holders). PP2 DE11 Website, discussion platform and brochures
5.3 Meetings (project internal) (Meetings with the other Partners for exchange of input, evaluation and comparison of results, Cooperation on shared tasks and for creation of the output / deliverables). PP1 CZ08 Meetings and minutes with established agreements
5.4 Workshops (with external experts) (Getting knowledge and information on BMPs currently used from experts, as well as getting feedback and ideas from them on the possible scenarios and applicability of innovative measures). PP1 CZ08 Workshops and minutes containing workshops outcome and future perspective on SWM
5.5 Auditing (Yearly audit of all transactions and follow-up of agreements, by an external accountant for each Partner, Publication and communication of results) PP1 CZ08 Five official reports (one for each Partner) on finalised audit per year

Milestones

No. Milestone Month of completion Description of milestone Deliverables
1 12/2005 Launch of the web-based database and discussion platform Web-site
2 03/2006 Design for the pilot implementation Reports
3 06/2006 Definite version of the Rainfall-Runoff-Model for development areas Computer models & reports
4 09/2006 Assessment of causes and potentials in flood potential areas Report
5 12/2006 Construction of flood protection measures in relevant areas Pilot installment
6 12/2006 Implementation (construction) of stormwater management (SWM) measures in development areas Pilot installment
7 07/2005 SWM Master plans for the partner cities Reports
8 06/2007 Final publication of the SWM guideline for use throughout the CADSES region Reports