Raindrop kořenová stránka

News & Events

   
 
MONITORING INDICATORS
News & Events

Programme

   
 
MONITORING INDICATORS
INTERREG IIIB CADSES
CADSES Book "Project in progress"
Programme

Project RainDROP

   
 
MONITORING INDICATORS
Project principal data
Project content
Monitoring indicators
Work packages, Action Plan and Milestones
Consistency with INTERREG IIIB general strategies
Management of the project
Follow up actions
Project partners
Payment Claim
Contacts
Project RainDROP

Raindrop kořenová stránka

MONITORING INDICATORS

Category(ies) of intervention

Category /
Subcategory
Area of intervention indicative
proportion (in %)
35 Planning and rehabilitation 15
352 Rehabilitation of urban areas 15
41 Technical assistance and innovative actions
(ERDF, ESF, EAGGF, FIFG)
85
411 Preparation, implementation, monitoring, publicity 15
412 Evaluation 7,5
413 Studies 7,5
414 Innovative actions 55

Types of action

1. Planning activities (transnational studies and strategies, land use plans, etc.)

  • Analysis of potentials for decentral SWM, followed by the development of integrated SWM strategies, concepts and monitoring system
  • Scenario development for decentral SWM
  • Examination of retention possibilities development area catchment areas.
  • Investigation of existing retention systems and assessment
  • Modelling of impact for different SWM scenarios including floodplain determination
  • Evaluation and assessment of scenarios

2. Networking

  • Negotiation of SWM design objectives with decision makers in all partner cities
  • Establishment of a new, as well as extension and intensification of cooperation in existing, transnational networks and network related activities

3. Pilot actions

  • Making a Rainfall-Runoff-Model (STORM) for all partner cities, including urban and rural areas
  • Implementation of state-of-the-art SWM measures in all partner cities
  • Finalising the results in a Master plan (report)
  • Implementation of state-of-the-art flood protection measures in relevant partner cities

4. Information, training, awareness raising

  • Exchange of data, information, methods and procedures in the field of water management
  • Transnational project management with organisational structure and costs
  • Financing of implementation structures proposed by transnational strategic concepts

Territory concerned: location of project activities (NUTS II)

The locations where the project will take place are five separate locations, of which two in the Czech Republic (City of Karviná near the border with Poland and The Vsetín Microregion near the border with the Slovak Republic), one in Germany (City of Kupferzell near Stuttgart), one in Greece (Municipality of Aharnai near Athens) and one in Slovak Republic (City of Trenčín near the border with Czech Republic).

rainDROP location NUTS II code
Karviná CZ08
Kupferzell DE11
Trenčín SK02
Aharnai GR30
Vsetín CZ07

Quantified expected outputs

  Description Unit Quantified output indicators Timeframe
1 Number of SW master plans n/a 9 2005 – 2006
2 Number of actions aiming at identifying the location of retention areas and settlement structures n/a 4 2005 – 2006
3 Number of projects dealing with implementation of SWM n/a 5 2005 – 2007
4 Number of projects dealing with flood control n/a 4 2006 – 2007
5 Web-site for SWM information incl. discussion platform (for internal and external use) n/a 1 2005 – 2007
6 Reports n/a 11 2006 – 2007

Quantified expected results

  Description Unit Current situation Quantified
result
indicators
1 Number of innovative SWM instruments (e.g. monitoring systems, BMPs) implemented n/a 0 6
2 Number of BMPs implemented with regard to flood prevention n/a 0 4
3 Number of authorities concerned n/a 0 20
4 Number of exchange platforms created n/a 0 2
5 Decision makers’ awareness on long-term integrated SWM planning n/a Low High
6 Area connected to SWM measures m2 200.000 2006 – 2007
7 Storage volume for SW retention m2 3.500 2006 – 2007
8 Discharge rate from connected areas (indicator for retention) l/sec/hectare ~100 ~10

Quantified expected impacts

  Description Unit Quantified
impact
indicators
Timeframe
1 Number of land use plans which are to be adapted to the needs of SWM n/a 5 2006 ->
2 Stakeholders’ awareness on long-term integrated SWM planning n/a increased 2007 ->
3 Public awareness of importance of SWM n/a increased 2007 ->
4 Number of land use plans which are to be adapted to the needs of SWM n/a 5 2006 ->
5 Re-occurrence period for flood events in affected areas n/a ~1 ~25-50